Assign topic to the user
I don't think there is a standard for Error-proof devices. But according to article 10.2.4 of the IATF 16949.2016 standard; Both production and product verification methods of error-proof devices must be specified in the control plan. For example, let's assume that there is 100% control of the product on the production line with a camera. You verify this camera with the "NOK" master sample per shift. Here in the control plan, you need to enter the verification of each shift with the "NOK" master sample.
Comment as guest or Sign in
Jul 13, 2021

