SPRING DISCOUNT
Get 30% off on toolkits, course exams, and Conformio yearly plans.
Limited-time offer – ends April 25, 2024
Use promo code:
SPRING30

Expert Advice Community

Guest

Inspection and dock audit template and minimum criteria to satisfy IATF requirements

  Quote
Guest
Guest user Created:   Apr 30, 2021 Last commented:   Apr 30, 2021

Inspection and dock audit template and minimum criteria to satisfy IATF requirements

We have been working hard through the tool kit we have purchased. 1. Is there a template for receiving inspection and dock audit? 2. What is the minimum criteria to satisfy IATF requirements?
0 0

Assign topic to the user

IATF 16949 DOCUMENTATION TOOLKIT

Step-by-step implementation for smaller companies.

IATF 16949 DOCUMENTATION TOOLKIT

Step-by-step implementation for smaller companies.

Expert
Fırat İnceli Apr 30, 2021

1. Is there a template for receiving inspection and dock audit?

There is no template for receiving inspection and dock audit.

Receiving inspection should be done according to the technical drawing of the product received. A number of samples, measured values, and specifications, visual result, certificate check result, packaging, labeling, weight, etc controls should be found on the relevant form. As you know dock audit is ‘’ a quick, final inspection of finished products before they are sealed, boxed, and approved for shipping. It is a visual inspection typically performed by quality control inspectors on the shipping dock of a warehouse shortly before the product is loaded onto a freight truck for delivery.

So, if it covers the above topics, you can use your own list of questions for dock audit and receiving inspection.

2. What is the minimum criteria to satisfy IATF requirements?

Dock audit is not a requirement for IATF 16949:2016, but you should do it if you have a customer's specific requirement. Receiving inspection should be made and should be measured according to the technical drawing of the product received, and if necessary, results such as appearance, weight, quantity, certificate control, etc.

Quote
0 0

Comment as guest or Sign in

HTML tags are not allowed

Apr 30, 2021

Apr 30, 2021

Suggested Topics

Guest user Created:   Aug 29, 2023 IATF 16949
Replies: 1
0 0

NPI project for IATF

Guest user Created:   May 15, 2023 IATF 16949
Replies: 2
0 0

Chapter 10.3 from IATF