Postponing Management Review
We perform our Management Review on an annual basis and we always try to do it in May if I have to postpone it to August this year. Is that a problem?
Assign topic to the user
According to the ISO 13485:2016 requirement 5.6.1 Management review General, is stated that Top management must review management system at documented planned intervals to ensure that the system is stable, adequate and efficient. Therefore, if your planned interval is one year, and usually it is done in May, than you should do it in May. If you had shorter interval of doing the management review, then it would be acceptable to postpone it, but since one year is a very long period of time, it is not advisable to postpone it.
For more information How to perform management review according to ISO 13485, please read an article on the following link:
Comment as guest or Sign in
Apr 29, 2020