Is shift change confirmation report required?
Is a shift change confirmation report required?
Assign topic to the user
According to IATF 16949 standard, 9.2.2.3; While the production process is being audited, each shift should be audited and the shift change should be sampled and the relevant evidence should be written in the audit report.
Comment as guest or Sign in
Apr 27, 2023

