I would like to know what would be on a list of deliverables for an NPI project in an IATF-certified organization
Assign topic to the user
In the new product introduction process (NPI), you should comply with the requirements of clause 8.3 of the IATF 16949:2016 standard. All requests on this subject are specified in sub-items 8.3 and 8.3.
I have listed a few conditions that should be followed on this subject below, but I recommend that you review these relevant articles in detail.
- If you are designing products, design FMEA
- Process FMEA
- Control Plan
- Project Plan
- Feasibility analysis
- Design validity test plan and tests
- Prototype control plan
- Product and process validation records
- MSA and SPC studies
- All PPAP requests
- Customer-specific requirements about it, etc.