ISO 27001 & 22301 - Expert Advice Community

Guest

Guest

Create New Topic As guest or Sign in

HTML tags are not allowed

Assign topic to the user

  • Risk assessment and application control practical examples

    1. Can we have properly filled out examples (not the easy ones like in the book) of the
  • Business continuity strategy, plan, and procedure

    i'm really confius here.. what is the difference between BC strategy, BC Plan, BC Procedure. really appreciate if you could provide example or sample as well.
  • Business continuity in specific industries

    These days a thought is pondering my mind. Its related to Business Continuity Planning. It is easy to understand business continuity planning in sectors like Telecom or Banking, BCP in these sectors is not too hard to achieve.
  • Integrated management systems

    assuming an organisation already has an iso 9001 certification and decides to implement iso 27001 certification, will you advise the isms to establish its own document control procedures and related records separate from the 9001 certification system?
  • Implementation cost

    ¿cual es el valor aproximado para implementar la ISO 27001 en un centro de apoyo logístico de evaluación en Colombia ?
  • Records required in an IT project

    What information needs to be store for audits for IT project. My project having functions like register login logout, messaging
  • Toolkit list of documents

    1- I have two documents, both of which include a checklist of Mandatory Documents required by ISO 27001. However, there are some minor differences. Could you please confirm that the revised 2015 version 3.1 is the newest update and I should disregard the 2013 revision.
  • SoA content

    Does the SOA need to contain justification for inclusions, and whether they are implemented or not. I was under the impression only the reason for exclusion is required.
  • ISO 27001 Annex A checklist

    Is there a ISO 27001"2013 Appendix A Verification and Validation procedures that exists. We are going into stage 2 ISO Cert and for future assessments we will be doing need to have those procedures if they exist.
  • Operational planning and control documentation

    Is it a mandatory requirement to document 8.1 operational planning and control? My thoughts are around showing what controls and planning are in place rather than a 'manual' describing what we do.