We do pump manufacturing and use CNC machining for different impellers, shafts and shells of different kind close to 1000. 12 years back the operator started to document the tool offset and work offset of the different programs on the CNC machine so he can use the same information to run the same part next time. So now we have 5 files containing work offset and tool offset (numerical) for 1000 programs. They are cheat codes developed by the operator not MPI, SOPS and Setup sheets. The quality wants to enter all that information in excel sheet and share it in the company drive. Its hard to enter all of the information and small mistake will crash the machine while using them and I also we think they are just trying to move this cheat codes from files to computer; not even on the company website. So what will the procedure to make this files as controllable documents so we don't need to copy all this in Excel. All this documents are handwritten.
Context and interested parties in Construction
I want support in knowing examples for 4.1 & 4.2 in ISO 9001:2015 our scope is infrastructure developers & EPC contractors for Civil/Electrical/Hydraulics/Mechanical/Waste Management& Environmental projects
Managing processes in a process map
Would that be possible to help me to define input and output of managing process, please?
An ISO 9001 audit
"What constitutes an ISO 9001 audit"
FSMS 22000 vs QMS
What are the basic difference between FSMS 22000:2005 and QMS
Applying clause 8.5.1
How can I apply clause 8.5.1 to a CCCC manufacturing company?
Revision and changes
I have one question for about document traceability. May I change forms without revision?
Efficiency and effectiveness
1.As stated below is this a good quality objective for M &E Department ?
ISO 9001 vs ISO 22000
Is ISO 9001 is for general usage while the 22000 is specially for the food industry
Defining good objectives
To track implementation of the strategic plan thorough monitoring and evaluation on the first cycle M &E plan by 2019 is it a good objective?