Guest
Per the IATF requirements can you provide me with supplier timing for performing the Flammability requirements. PPAP and Annual validation?
Why would a finding for not writing the actual measurements on an operator data sheet fall under the control plan? The finding was that the operator wrote a checkmark instead of the actual measurement from a variable gauge. The operator did not follow the instructions that's it. tho the clause referred to is the control plan annex A of the iatf standard
Safety Points / Safety precautions comes under which clause of IATF 16949:2016.??