Guest
We are learning and preparing document for IATF 16949 certification. We have concerning about the Auditor
- Internal auditor and Supplier auditor
Do we need to have IATF 16949 certification for those auditors?
Per the IATF requirements can you provide me with supplier timing for performing the Flammability requirements. PPAP and Annual validation?
Why would a finding for not writing the actual measurements on an operator data sheet fall under the control plan? The finding was that the operator wrote a checkmark instead of the actual measurement from a variable gauge. The operator did not follow the instructions that's it. tho the clause referred to is the control plan annex A of the iatf standard
Safety Points / Safety precautions comes under which clause of IATF 16949:2016.??